On this page
Give each gap a location and a purpose
Write ‘gap’ on a drawing and it is easy to misunderstand later. Instead, point to the exact location: between adjacent faces, at a board end, at the ceiling, or beside casing. Then state whether you are recording an appearance detail, a movement requirement, or clearance around an obstruction.
| Detail | What it describes | Where to keep it |
|---|---|---|
| Face reveal | The visible line between adjacent courses | Product profile and coverage notes |
| Perimeter clearance | Space required where the board field ends | Edge drawing and installation notes |
| End joint | The specified meeting detail between board ends | Seam plan and product instructions |
| Opening clearance | Space modeled around a measured opening | Opening configuration; not a perimeter allowance |
Wall edges and board joints are different places
Read the joint detail before inserting spacers
Some profiles establish the visible line when the boards are assembled as instructed. Adding a separate spacer can change the intended connection and the installed repeat. Metrie’s matte shiplap instructions call for snug assembly; that product detail should not become a rule for every board sold as shiplap.
Make a small dry assembly of your selected product and compare it with its drawing. Record what the manufacturer means by coverage. If the sample and specification disagree, resolve that difference before multiplying it across a wall. The correct question is how this profile is intended to meet, not which coin produces a familiar-looking line.
What the row example can check
This example shows rows and a final strip from the stated wall size and coverage. TrimLayout has no separate perimeter-gap input and does not subtract that allowance. Its opening-clearance control only concerns openings; increasing it will not reserve space at the ceiling or wall ends. Compare the row drawing with your confirmed edge clearances before fitting.
Worked layout
Horizontal shiplap coverage
Example measurements
- Wall
- 120 × 96 in
- Actual board face
- 6 in
- Installed coverage
- 5½ in
- Starting edge
- Bottom
Layout result
- Orientation
- horizontal
- Courses
- 18
- Final visible face
- 2 1/2 in
Write the confirmed clearance beside each edge
Sketch the wall and fill in the checklist below. Use the product identifier and instruction revision at the top of the sheet, so a replacement SKU does not inherit the old board’s requirements. A gap hidden at the bottom is only one part of the plan.
When the installation sheet is silent, send the manufacturer the product name, orientation, room conditions, and edge sketch. Ask which clearances apply and whether the proposed trim or sealant detail is compatible. Keep the answer with the product sheet. Silence in a short brochure is not a confirmed zero-clearance instruction.
Mark an unanswered edge as ‘to confirm,’ not zero. Recheck affected entries if the product, orientation, wall finish, or edge trim changes. Do not borrow a dimension from exterior siding or another product with a similar face pattern.
| Location | What the boards meet | What to confirm |
|---|---|---|
| Top | Ceiling, crown, or top trim | Required clearance and how the final edge is finished |
| Bottom | Floor, baseboard, or bottom trim | Required clearance and which trim conceals it |
| Left and right — record each separately | Inside corner, casing, return, or exposed edge | Clearance and finishing detail for each different junction |
| Doors, windows, and other interruptions | The actual casing or obstruction boundary | The product’s local edge detail; keep this separate from the four wall edges |
Schedule acclimation before final fitting
UFP-Edge’s Timeless sheet calls for acclimating its boards in the installation room. Use the selected manufacturer’s current requirements to plan storage and timing; do not turn that example into a universal number of days.
Record the delivery date, where the material will be stored, and the condition checks the supplier requires. Keep unopened replacement stock and the boards being fitted subject to the same documented instructions. If the room is still being dried, heated, or otherwise changed by other work, ask whether installation should wait.
If a joint looks different after the material has been on site, compare it with the joined sample and ask the supplier before changing the spacing to compensate.
Check the last strip against your edge sketch
Enter installed coverage according to the product’s definition. Do not add a decorative reveal again if that repeat already includes it. Keep the wall measurement reference consistent so you can relate each result to the same physical edges.
Find the final strip in the row drawing, then look at the same location on your edge sketch. Will the selected trim conceal the edge as intended while preserving the confirmed clearance? If the junction is awkward, compare a different starting layout or finishing detail before buying. Do not shrink the required clearance merely to make the last row look wider.
Common questions
Is a nickel gap an expansion gap?
Not automatically. The visible face line may be part of the machined profile. Movement requirements must come from the selected product’s installation instructions.
Should I caulk every gap?
Do not assume every gap is intended to be filled. Confirm the finishing detail and compatible materials for that location with the board manufacturer.
Does TrimLayout subtract a perimeter expansion gap?
No. Use the edge checklist above to check the row layout against your product’s confirmed clearances.
Sources and assumptions
- UFP-Edge: Timeless Shiplap Installation InstructionsInstructions for Timeless only: interlocking profile, acclimation, and different support arrangements by orientation. Do not transfer its fixing schedule to other products.
- Metrie: Prefinished Matte ShiplapThe installation section describes snug assembly, orientation-specific support, and staggered joints for this product. It does not establish a universal perimeter gap.